The building is transported to the site as a single module on a trailer. The installation process on-site is quick and precise, requiring minimal labor. It takes only one day to install the building, construct a terrace, and make external connections.

The preparatory work required on-site is minimal, as Smart LOFT only needs a flat substrate that can be accessed by a crane, as well as access to water, sewerage, and electrical connections.

The lifting and installation of the building can be carried out by the Smart LOFT installation team, its partner company, or a local contractor.